|
This
was
a
large
painting
project
for
a
large
school.
The
Interact
students
and
their
chaperones
painted
the
entire
exterior
front
of
the
school.
The
Mayor
of
Tela
has
agreed
to
continue
our
work
by
painting
the
remainder
of
the
school,
repair
four
roofs,
construct
two
new
roofs,
repair
window
frames,
do
electrical
work
and
install
a
new
septic
system.
That
school
will
be
a
shining
star
in
the
Tela
school
system.
|